Federal Court House (Energy Conservation Measures)

Washington, D.C.

Project Overview

Heffron delivered energy conservation measures across the central heating and cooling plants serving the E. Barrett Prettyman U.S. Courthouse and the adjoining William B. Bryant Annex — a fully occupied federal judicial complex where courtrooms, chambers, and secure spaces cannot lose conditioned air.

The scope centered on replacing end-of-life boilers and upgrading chiller capacity, along with the pumps, piping, valves, and controls that tie the plants together. Each measure was selected for measurable reductions in energy and water use while restoring redundancy and extending the service life of the plant equipment.

All work was phased around the court calendar. Temporary heating and cooling strategies, off-hours tie-ins, and staged cutovers kept both buildings continuously conditioned, and every system was carried through startup, testing, and commissioning to verified performance before the old equipment was retired.

Scope of Work

01

Central heating plant boiler replacement

02

Central cooling plant chiller upgrades

03

Pumps, piping, valves, and specialty accessories

04

Controls integration and sequence updates

05

Temporary heating and cooling with phased, off-hours cutovers

06

Startup, testing, and commissioning to verified performance

Project Details

Client

U.S. Federal Judiciary

Facilities

E. Barrett Prettyman Courthouse & William B. Bryant Annex

Sector

Government

Scope

Central plant energy conservation measures

Conditions

Fully occupied, phased around court operations