Project Overview
The Miltenyi North Building fit out consisted of approximately 25,000 sq ft of cGMP space, approximately 50,000 sq ft of lab and lab support area, and approximately 20,000 sq ft of office space. The project also had an existing 40 ft tall, 40,000 sq ft cGMP warehouse which was modified under this project.
The HVAC system consisted of chillers, cooling towers, DOAS units, hydronic boilers, steam boilers, and a clean steam generator. Heffron was brought on during the 35% phase of design and assisted in design to ensure that the overall project did not exceed the allocated budget.
The cGMP space utilized a German prefabricated wall system imported from Germany in the middle of the pandemic. Though this created logistical issues, the project team was able to complete the project on time and under budget. The project was completed in 2021.
Scope of Work
01
02
03
04
05
06
Project Details
Miltenyi
Gaithersburg, Maryland
Life Sciences
75,000 sq ft
Design Assist
2021
Have a similar project?