Home / Project / USDA

USDA | Building 307 Full-Building Renovation & Retrofit

Washington, D.C. Metro Area

Photo credit: https://stvinc.com

Project Overview

Heffron was selected to a design assist role on the USDA Building 307 Project. The USDA Building 307 project was a gut and retrofit of the existing 5 story building.

Heffron installed new chillers, AHU’s, steam to hot water heat exchangers, pumps, RODI system, vacuum system, and multiple DX systems.

Heffron was able to help maintain the budget given at the 35% design phase and give back savings based on design assist efforts. The project was successfully completed in 2022 and is in full operation.

Scope of Work

01

Design assist partnership from the 35% design phase forward

02

New chillers, air handling units, and pumps

03

Steam to hot water heat exchangers

04

RODI and vacuum systems

05

Multiple DX systems

Project Details

Client

U.S. Department of Agriculture

Sector

Government

Delivery

Design assist

Scope

Full gut and retrofit of a 5-story building

Completed

2022 — in full operation

Have a similar project?

Let's talk about what you're building.

Heffron self-performs mechanical construction across the DMV — Washington D.C., Maryland, and Virginia — including inside active, validated production facilities.